摘要
结合华光电厂2×600 MW机组辅机故障减负荷RB(RUN BACK)试验,针对在RB试验过程中暴露的问题进行分析,并采取了有效的改进措施,完善了RB功能。试验为今后类似机组RB功能的调试及其存在问题的处理提供参考。
Combined with the RB (run-back) function test of 600 MW unit in Huaguang Power Plant, measures to solve some problems exposed in the process of RB test are taken, and the function of RB is improved. The test provides reference to related units debugging and management of relative problems in the future.
出处
《山西电力》
2008年第3期15-16,33,共3页
Shanxi Electric Power