摘要
根据型钢混凝土梁式转换结构施工过程的特点和要求,详细介绍了该类转换层结构的模板支撑方案、钢筋绑扎、混凝土浇筑措施。并结合工程实践,提出了值得注意的关键问题以及技术措施,对同类工程施工具有一定的参考价值。
According SRC transfer beams, paper. Key problems vide reference to the to the characteristic and requirement of the construction process of complex building with framework support, bar strapping, concrete pouring methods are detail discussed in this and technical measures are put forward based on the engineering practice which can proconstruction of the structures of the same kind.
出处
《江苏建筑》
2008年第3期32-33,47,共3页
Jiangsu Construction
关键词
转换层
型钢混凝土梁
模板支撑
transfer storey
steel reinforced concrete beam
formwork support