期刊文献+

模糊综合评价法在人防工程建设项目后评价中的应用

Application of Fuzzy Comprehensive Evaluation Method in Postevaluation of Air Defense Construction Projects
下载PDF
导出
摘要 人防工程建设项目后评价立足总结项目建设的经验和教训,借鉴成功方面,改善不足的方面,有助于从项目经济评价的角度进行科学定位和规划,提高人防建设项目"三个"效益的发挥。文章重点分析了基于定量分析与定性分析的投资项目后评价方法在人防工程建设项目后评价中的应用。 The post evaluation of civil air defense construction projects bases on summing up the experience and lessons of the construction projects. Learning from the successful experience and correcting mistakes help us to orientation and planning scientifically from the view of economic evaluation. It is also good for playing the " three effectiveness" of air defense construction projects. The after evaluation method is mainly analyzed in this paper based on the quantitative analysis and qualitative analysis in civil air defense construction projects.
作者 陈群
出处 《江苏建筑》 2008年第3期69-72,共4页 Jiangsu Construction
关键词 人防工程建设项目 后评价 模糊综合评价 社会效益 air defense construction projects pot evaluation fuzzy comprehensive evaluation social benefits
  • 相关文献

参考文献2

二级参考文献5

  • 1黄恺.积极开展商业房地产项目后评价[J].城市开发,2004(10):76-79. 被引量:6
  • 2许晓峰 肖翔编.建设项目后评价[M].北京:中华工商联合出版社,1999..
  • 3Affhoher D P, "Outcome Monitoring" In J. S. Wholey,H. R. Hatry,and K. E. Newcomer, Handbook of Practical Program Evaluation ( pp. 96 - 118). San Francisco: Jossey-Bass, 1994.
  • 4Bickman L. Using Program Theory in Evalution (New Directions for Program Evalution, no. 33 ), San Francisco: Jossey-Bass.1987.
  • 5E Chelimsky, Shadish W R. Evaluation for the 21^st Century. - A Handbook. Thousand Oaks,CA: sage,1997.

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部