对宁夏电网2007年火电机组非计划停运情况进行汇总,通过分析影响大机组非计划停运的主要因素,提出降低非计划停运的措施,为宁夏电网并网火电机组提高运行可靠性提供了依据。
Collects the situation of non-plan shutdown for coal buring power plant units of Ningxia Power Grid in the year of 2007, by analyzing the main factors to affect non-plan shutdown of the large units, puts forward the measures of reducing non-plan shutdown, provides the gist for improving the power supply reliability of combining fossil fuel power plant units with Ningxia Power Grid.
出处
《宁夏电力》
2008年第3期4-7,共4页
Ningxia Electric Power
关键词
宁夏电网
火电机组
非计划停运
分析
Ningxia Power Grid
coal buring power plant units
non-plan shutdown
analysis