摘要 考虑了多种变质性产品在有限计划期内的经济批量计划问题,在假定生产率、需求率、变质率均为常量,以及多种变质产品具有共同生产周期的情况下,证明了总费用函数是凸函数,给出了寻找最优生产策略的算法。 Assuming that the production rate. demand rate and deteriorating rate of each product are constant and deteriorating items have the common production cycle, the paper proves that the total cost function is convex and presents an algorithm to obtain the optimal production policy.
出处 《物流技术》 2008年第6期72-74,81,共4页 Logistics Technology
关键词 变质性产品 经济批量计划问题 共同生产周期 有限计划期 deteriorating items economic lot scheduling problem common production cycle finite planning horizon
  • 相关文献

参考文献9

  • 1R Haji, M Mansuri. Optimum common cycle for scheduling a single-machine multi-product system with a budgetary constraint [J].Production Planning & Control, 1995, 6 (2): 151-156.
  • 2B C Girl, I Moon. Accounting for idle capacity cost in the scheduling of economic lot sizes [J].International Journal of Production Research, 2004, 42(4):677-691.
  • 3S Sharma. Incorporating fractional backordering in the multi-product manufacturing situation with shelf-lives [J]. Proceeding of the Institution of Mechanical Engineers, 2006, (220).
  • 4Amit Eynan. The benefits of flexible production rates in the economic lot scheduling problem [J]. IIE Transactions ,2003, (35): 1 057-1 064.
  • 5B N Khoury, N E Abboud, M M Tannous. The common cycle approach to the ELSP problem with insufficient capacity [J]. International Journal of Production Economics, 2001,(73): 189 - 199
  • 6Jamal Ouenniche, F F Boctor. The two-group heuristic to solve the multi-product, economic lot sizing and scheduling problem in flow shops [J]. European Journal of Operational Research, 2001,(129): 539 - 554.
  • 7J Ouenniche, F Boctor. Sequencing, lot sizing and scheduling of several products in job shops: the common cycle approach [J]. International Journal of Production Research, 1998, 36(4): 1 125 -1 140.
  • 8B Akrami, B Karimi, S M Moattar Hosseini. Two meta-heuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: The finite horizon case [J]. Applied Mathematics and Computation ,2006, (183): 634-645.
  • 9G C Lin, D E Kroll, C J Lin. Determining a common production cycle time for an economic lot scheduling problem with deteriorating items [J]. European Journal of Operational Research, 2006,(173): 669-682.