摘要
为减少安装轨道衡施工对港口生产的影响,对3个安装轨道衡施工方案进行分析,择其最佳方案—全线封闭并采用灌浆料方案。然后对施工工艺流程作较详细的阐述,施工后证明该方案施工简单,安全质量可控。
In order to reduce the influence of the installation construction of the rail balance, this paper analyses 3 plans for installing the rail balance and chooses the best one a plan of closing the railway and by filling pulp. It states in detail the technological procedure. It is proved by the fact that the construction is convenient and the quality is controllable.
出处
《港口科技》
2008年第6期33-35,49,共4页
Port Science & Technology
关键词
轨道衡
施工
工艺
分析
rail balance construction technology analysis