摘要
通过对宣化钢铁公司小吴营选矿厂尾矿库工程的设计,提出了一种新的处理坝基岸坡湿陷性黄土的措施。这一措施不仅可以节约大量基建投资,而且也大大简化了施工方法。
A new measure to deal with wet-collapsing loess on slope of site base was proposed in design of tailings site of ore-dressing plant of XISCO. With this measure a good quantity of construction invest can be saved and construction process simplified greatly.
出处
《河北冶金》
1997年第4期4-7,13,共5页
Hebei Metallurgy