6ROWE K,BADV K.Chloride migration through clayey silt underlain by fine sand or silt[J].Journal of Geotechnical Engineering,ASCE,1996,122(1):60-68.
7ROWE K.Long term performance of contaminant barrier systems[J].45th Rankine Lecture,Geotechnique,2005,5(9):631-678.
8BENSON C H.Liners and covers for waste containment,Creation of New Geo-Environment[C]//Proc 4th Kansai Int'l Geotechnical Forum,JGS Kansai Branch,2000:1-40.