文章介绍广州市地铁三号线客大盾构区间在地下洞室内盾构机调头方案的优化过程和调头的成功经验,为今后盾构法施工工法的选择提供了一定的借鉴。
The paper introduces the turnabout of a shield machine in an underground cavem on Guangzhou subway Line 3 on the transit section from Kecun station to Datang station. The optimization process of turnabout options and the experience involved are described in detail which provides guidance for shield tunnel projects.