超超临界发电工程CDM项目开发的研究

Development of CDM projects for ultra-supercritical power generation engineering
原文传递
导出
摘要 结合江苏国电泰州超超临界发电工程CDM项目开发的实践,论述了超超临界发电工程CDM项目识别的要求,论证了项目设计中基准线方法学的应用、减排量的计算以及额外性问题。 Based on the practice of CDM project development for Jiangsu Guodian Taizhou ultra-supercritical power generation engineering project, the requirements of CDM project identification are illuminated. The application of baseline methodology to project design is recommended, as well as the emission reduction calculation and additionality issues.
出处 《华东电力》 北大核心 2008年第6期97-101,共5页 East China Electric Power
关键词 清洁发展机制 项目设计文件 核证的减排量 基准线 方法学 额外性 Clean Development Mechanism ( CDM ) project design document certified emission reduction baseline methodology additionality
  • 相关文献

参考文献5

  • 1中国电力年鉴编委会.2004中国电力年鉴[M].北京:中国电力出版社,2004.
  • 2中国电力年鉴编委会.2005中国电力年鉴[M].北京:中国电力出版社,2005.
  • 3中国电力年鉴编委会.2006中国电力年鉴[M].北京:中国电力出版社,2006.
  • 4Nuclear energy agency, International energy agency. Projected Costs of Generating Electricity 2005 update[ M]. Head of Publications Service 2005 : 174.
  • 5GB2589-81,综合能耗计算通则[S].

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部