1号竖井20中段贯穿工程爆破实践

PRACTICE OF HOLING-THROUGH PROJECT AT LEVEL 20M IN NO.1 SHAFT BY ENGINEERING BLASTING
下载PDF
导出
摘要 由于1号竖井20中段提升能力不足,井底车场需进行扩建,工程由空车绕道贯穿竖井和人行绕道贯穿马头门两部分组成。为减少对生产的影响,保护施工人员和周围设施的安全,精心安排了施工程序、合理设计爆破参数和起爆网路、周密搭设多层保护挡台,在复杂环境下确保了施工安全、提前完成扩建任务,为类似工程提供借鉴。 Due to the insufficiet hoisting capacity at Level 20m of No.1 Shaft,its shaft station needed to be expanded.The expanding project included two parts,one was the empty running around which holes-through the shaft wall,and the other was the service run around which holes-through ingate.In order to reduce the impact on the normal operation,and to protect the operators and the equipments nearby,the operating process was arranged carefully,the blasting parameters and the initiating system were designed reasonably and several platforms were built meticulously.All these contributed to the successful accomplishment of the project ahead of the schedule.This practice provided experiences for the similar projects.
出处 《工程爆破》 2007年第3期45-47,共3页 Engineering Blasting
关键词 竖井 贯穿 爆破 实践 Shaft Hole-through Blasting Practice
  • 相关文献

参考文献3

  • 1匡传诚.黄沙坪铅锌矿的采矿方法及完善发展思路.有色金属采矿,1998,(2):6-9.
  • 2王红绪.尹格庄金矿低品位矿床开采工艺的改进.有色金属采矿,1997,(3):22-25.
  • 3冀海河,李占增,李文国.硬岩中竖井的爆破施工[J].工程爆破,2007,13(1):50-52. 被引量:4

二级参考文献1

  • 1傅菊根.立井井筒坚硬岩石爆破设计[A].第七届工程爆破学术论文集,成都,2001.

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部