摘要
从建筑群综合布线系统的总体结构、信息点配置、利用综合布线实现以太网在线供电、机柜中配线布置以及设备用房设置等5个方面,对综合布线系统工程设计与施工图集(08X101-3)修编后的主要补充内容进行了详细解读。该图集将有效地配合GB 50311—2007和GB 50312—2007的实施,为综合布线工程设计和施工人员提供有效的指导,帮助其解决在工程设计与施工中经常会遇到的问题。
From five aspects,such as the whole construction of building's generic cabling system,configuration of information points,realization of PoE,cabling in the cabinet and setting of equipment room,the main revision of engineering design and construction of generic cabling system drawings(08X101-3) were interpreted in detail.Through combining with the implementation of GB 50311—2007 and GB 50312—2007,some references will be given to the designers and builders who engage in the generic cabling and help them resolve the common technology questions during the engineering designing and construction.
出处
《低压电器》
北大核心
2008年第12期16-21,共6页
Low Voltage Apparatus
关键词
综合布线
信息点
电缆
链接
以太网供电
机柜
generic cabling
information point
cable
link
power over ethernet(PoE)
cabinet