期刊文献+

现代化大型综合性医院筹建模式初探 被引量:3

Primary Discussion on Construction Preparation Models for Big Modern General Hospitals
下载PDF
导出
摘要 介绍了现代化大型综合性医院——深圳市滨海医院的项目概况。通过对比以往大型综合性医院采取成立临时性筹建组的筹建模式,重点介绍了滨海医院项目成立筹备办公室负责医院筹建工作的筹建模式和具体做法,旨在探讨适合现代化大型综合性医院又好又快的建设筹建工作模式。 This article presents the general aspect of the project of Binhai Hospital of SHENZHEN City, as a big modern general hospital. In order to explore and look for a better, and efficient model to do construction preparation for big and modern general hospital construction, this article mainly explains the mode to set up an official construction preparation office and concrete method to assuming all construction preparation for the above hospital construction and compares the used way as contrast: to design a temporary construction preparation team for a big genera hospital construction.
出处 《中国医院建筑与装备》 2008年第6期8-11,共4页 Chinese Hospital Architecture & Equipment
关键词 综合性医院 筹建模式 医院管理 医院筹建工作 General hospital Construction preparation model
  • 相关文献

参考文献3

二级参考文献5

共引文献12

同被引文献10

引证文献3

二级引证文献39

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部