摘要
结合连接深圳—香港的深圳湾大桥非通航孔海上悬臂拼装连续箱梁工程实践,介绍节段预制、运输,墩旁支架、边跨支架设置,预制0#块吊装、对位等采取的施工技术,以期为类似工程施工提供有益借鉴。
With the construction practice of cantilever-assembling the continuous box girders,at sea, of the non-navigational span of the Shenzhen Gulf Bridge connecting Hongkong and Shenzhen as a practical example, the precasting and transportation of sections, pier-side supports, side-span supports, and the precasting, erection and aligning of 0 # sections, etc. , are dealt with in the paper. It is expected to serve as a useful reference for the construction of other similar projects.
出处
《国防交通工程与技术》
2008年第4期51-53,66,共4页
Traffic Engineering and Technology for National Defence
关键词
悬臂拼装
0#预制
支架
海上施工
cantilever-assemble
precasting of 0 #
supporting frame
construction at sea