摘要
根据工程实例,介绍了贝雷梁拱架拼装方法与施工控制计算,根据拼装过程中的监控与测量结果显示,与计算结果基本一致,拱架拼装精度达到了设计提出的要求,从而指出采用贝雷梁拱架是山区深谷地带拱桥施工较为合适的方案。
According to the project examples it introduces the bailey beam bow member consolidation methods and construction control calculation, and points out that it is the more proper program to mountain area arch bridge construction of using bailey beam bow member according to the supervision and the measuring effect expresses in the consolidation process, and it is consistent with the calculation effect, and the bow member consolidation accuracy meet the need of design.
出处
《山西建筑》
2008年第21期325-326,共2页
Shanxi Architecture
关键词
悬拼贝雷梁拱架
箱形拱桥
拼装
bailey beam bow member, box arch bridge, consolidation