摘要
通过石太客运专线石板山隧道DIK51+170-DIK51+410段全断面帷幕注浆施工实践,着重阐述了分段后退式帷幕注浆施工参数的确定及具体的施工工艺,以积累帷幕注浆施工经验,为今后在类似工程中提供借鉴。
Throug Shi-Tai passenger Shibanshan tunnel DIKS1 + 170- DIK51 + 410 whole section of the curtain grouting construction prac tice, with an emphasis on sub-back curtain grouting, the decision of construction parameter and the specific. Construction technology to accumulate the experiences curtain grouting technology, for a similar project in the future for reference.
出处
《山西建筑》
2008年第21期328-329,共2页
Shanxi Architecture
关键词
隧道
帷幕注浆
堵水技术
tunnel, curtain grouting, water shut off technology