首先介绍了计算机机房工程所包含的系统,应用系统集成的观点,从分工界面、实施步骤、输入输出、参照标准、异常处理五个维度对项目实施阶段进行了说明,总结了在计算机机房工程集成实施过程中所采用的管理流程和方法。
The author firstly introduces the system of the computer room project and the viewpoint of the application system integration, explains the project implementation stage from the aspects of the division interface, the implementation steps, the input-output, the reference standard and the exception handling, summarizes the management process and method in the implementation process of the integration of the computer room project.
出处
《山西建筑》
2008年第21期364-365,共2页
Shanxi Architecture
关键词
计算机机房
系统集成
项目管理
实施过程
computer room, system integration, project management, implementation process