期刊文献+

苏只水电站工程1号机蜗壳顶板裂缝处理及分析

Analysis and treatment of cracks at spiral case head cover of Unit 1
下载PDF
导出
摘要 苏只水电站1号机蜗壳顶板第1层混凝土在浇筑过程中,由于模板支撑结构失稳,致使已经浇筑混凝土发生严重下沉变形,而导致局部混凝土出现贯穿性裂缝;裂缝表面最大宽度2.0mm左右,沿顺水流方向长达20多m。用三维接触非线性有限元分析裂缝对蜗壳顶板稳定的影响,并根据裂缝分布提出加固措施。 Local penetration cracks in concrete occurred due to serious settlement and deformation of placed concrete resulted from un - stabilization of formwork support during placing the first layer of concrete for the spiral case head cover of the Suzhi hydropower project Unit 1. The maximum width of crack surface is about 2.0 ram, over 20 m long in the direction of flow. The influence of cracks on the stability of the spiral case head cover is analyzed using 3 - D contact nonlinear limit element, and strengthening measures are put forward based on cracks distribution.
出处 《西北水电》 2008年第2期18-21,共4页 Northwest Hydropower
关键词 苏只水电站 蜗壳顶板 裂缝 加固 接触 Suzhi HPP spiral case head cover crack strengthening contact
  • 相关文献

参考文献3

  • 1西北勘测设计研究院.水工钢筋混凝土结构设计规范(DL/T5057—1996)[M].北京:中国水电出版社,1996.
  • 2石广斌,杨经会,牛天武.苏只水电站工程1号机蜗壳顶板裂缝对蜗壳整体稳定影响三维有限元分析报告[R].西安:西北勘测设计研究院,2005.
  • 3石广斌,吴凯,杨经会.弹性应力配筋法的探讨及应用[J].水电站设计,2003,19(1):36-39. 被引量:17

二级参考文献2

  • 1蒋孝煜.有限元基础[M].清华大学出版社,1992..
  • 2电力工业部西北勘测设计研究院.水工钢筋混凝土结构设计规范(DL/T5057-1996)[S].北京:中国电力出版社,1997..

共引文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部