摘要
黄河苏只水电站为河床式电站。在可行性研究阶段,电站厂房布置严格按照规范进行设计。随着设计工作的深入,在符合国家规程规范和分析研究的基础上,施工详图阶段,本着为业主节省建设投资,及时采纳新技术、新工艺,为加快施工进度创造条件的服务原则,对电站厂房布置及结构设计进行了设计优化和调整,大大缩短了施工工期,为首台机早日投产发电创造了有利条件。
Suzhi hydropower station is a run - of - river project. The powerhouse structure is designed strictly on the basis of national standards at the feasibility study stage. In order to speed up construction, along with the development of design and in. compliance with relative national codes and standards, new technologies and workmanship are adopted to optimize and modify the structure design at the detailed design stage, and to save investment for the Employer. This greatly shortens the construction period and facilitates the commissioning of the first unit in advance.
出处
《西北水电》
2008年第2期22-23,共2页
Northwest Hydropower
关键词
苏只水电站
厂房
结构设计
优化措施
Suzhi HPP
powerhouse
structure design
optimization measures