期刊文献+

苏只水电站厂房结构设计的一些优化措施

Powerhouse structure design optimization for Suzhi hydropower project
下载PDF
导出
摘要 黄河苏只水电站为河床式电站。在可行性研究阶段,电站厂房布置严格按照规范进行设计。随着设计工作的深入,在符合国家规程规范和分析研究的基础上,施工详图阶段,本着为业主节省建设投资,及时采纳新技术、新工艺,为加快施工进度创造条件的服务原则,对电站厂房布置及结构设计进行了设计优化和调整,大大缩短了施工工期,为首台机早日投产发电创造了有利条件。 Suzhi hydropower station is a run - of - river project. The powerhouse structure is designed strictly on the basis of national standards at the feasibility study stage. In order to speed up construction, along with the development of design and in. compliance with relative national codes and standards, new technologies and workmanship are adopted to optimize and modify the structure design at the detailed design stage, and to save investment for the Employer. This greatly shortens the construction period and facilitates the commissioning of the first unit in advance.
出处 《西北水电》 2008年第2期22-23,共2页 Northwest Hydropower
关键词 苏只水电站 厂房 结构设计 优化措施 Suzhi HPP powerhouse structure design optimization measures
  • 相关文献

参考文献2

  • 1石广斌.苏只水电站楼板结构优化设计研究[R].西安:西北勘测设计研究院,2004.
  • 2牛天武.苏只水电站桥机吊车梁配筋设计计算[R].西安:西北勘测设计研究院.2004.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部