在苏只水电站泄洪闸浇筑过程中,革新了悬臂大模板贴胶合板方案。详述胶合板模板应用原则和结构特点,以及胶合板模板在泄洪闸混凝土浇筑中的具体规划。应用胶合板模板,提高了混凝土外观质量,积累了胶合板模板使用的经验。
In the sluice concreting of the Suzhi Hydropower project, the scheme of sticking plywood on the large cantilever formwork is renovated. This paper describes in detail the application principle and structural features of plywood formwork and its layout during concreting the sluice. By application of plywood formwork, concrete appearance quality is improved, and experience in using plywood formwork is accumulated.