摘要
阐述了广州南洲水厂工程二级泵站及吸水井构筑物地下连续墙的施工过程,针对该工程的重点及难点,提出了相应的施工工艺,解决了施工难题并进行了技术创新,可供类似工程借鉴、参考。
It describes the process of building underground continuous wall in secondary pump station and in absorbing - well structures. In terms of main points and difficulties of the project, the author recommends some relative techinical processes and innovations made by him to solve the problems during the construction for reference by similar engineering projects.
出处
《有色金属设计》
2008年第2期14-17,共4页
Nonferrous Metals Design
关键词
地下连续墙
钢管接头
软土地基
Underground continuous wall, tie - in of iron pipe, soft foundation