摘要
通过水泥浆沉积试验,结合工程实践对成孔压浆桩的成桩机理进行研究分析,并对其工程应用中存在的一些问题提出了新的论据.
Through mortar sedimentation test and combining theory with practical engineering,the research about the pile formation mechanism of Pressing mortar pile with a hole is made. And some new views about the problems existing in the engineering application are presented.
出处
《青岛建筑工程学院学报》
1997年第3期12-16,30,共6页
Journal of Qingdao Institute of Architecture and Engineering
关键词
置换压浆
水泥沉积
成孔压浆桩
成桩机理
replacement of pressing mortar,cement sedimentation,unmixed cement mortar,to limit stability