摘要
从投标阶段、施工阶段和收尾阶段分析了工程款拖欠形成的原因,就如何抓好清欠工作进行了深入探讨,并提出了具体的方法,从而帮助施工企业走出资金周转困难的低谷,步入良性循环的轨道。
The thesis analyzes the causes of project payment delinquency from the periods of bidding, constructing and ending. After the deep discussion about how to deal with the debt-cleaning work well, the detailed measures have been promoted to help the construction enterprise get rid of the lack of capital turnover and walk into the virtuous circle.
出处
《山西建筑》
2008年第22期248-249,共2页
Shanxi Architecture
关键词
施工企业
工程款
清欠工作
资金
construction enterprise, construction payment, debt-cleaning, capital