摘要
介绍厦门海底隧道的初期支护、二次衬砌防水施工措施以及几种措施组成的防水体系,论证"以堵为主,排堵结合"的隧道防水方案。
It introduces the Xiamen subsea tunnel's initial period supports and protections, secondary lining waterproofing construction measures, and waterproof system composed of several measures, discusses the possibility of "stop-up as the main, unifying discharge and stop-up together" which brings good effect.
出处
《石家庄铁路职业技术学院学报》
2008年第B06期124-128,共5页
Journal of Shijiazhuang Institute of Railway Technology
关键词
海底隧道
防水
施工措施
subsea tunnel waterproof construction measures