摘要
结合厦门海底隧道二次衬砌混凝土施工,介绍C45高性能耐久性混凝土在海底特殊环境下的配合比设计、工作性能及施工注意事项,为类似工程的施工提供借鉴。
with the construction of Cross-Harbour Tunnel secondary lining concrete, introduce C45 high-performance durability concrete's design, construction and notice in the special seabed circumstances, give the construction of similar projects for reference.
出处
《石家庄铁路职业技术学院学报》
2008年第B06期153-156,共4页
Journal of Shijiazhuang Institute of Railway Technology
关键词
厦门海底隧道
C45高性能混凝土
耐久性
submarine tunnel in Xiamen C45 High Performance Concrete durability