摘要 本文根据曹娥江五甲渡裁弯工程设计实践,通过实测资料分析与数学模型计算的有机结合,提出了一种新的蜿蜓性河道人工裁弯方法———基本成型法.主槽与防洪堤基本成型,新河部分土方人工开挖,其余部分借助水力自然冲刷,使得工程一气呵成的同时,工程量也显著降低,并能最快发挥效益.文章重点阐述了裁弯新河的设计方法,分析了其适用条件.按这一方法设计的上述工程已经开工. Combining the field data analysis with the mathematical model, this paper proposes a new construction method of river cut off for meandering river which named as the basic formed method. By using this method, the main channel and flood protection embankment are basically formed during construction. Most earthwork of the new channel are excavated artificially and the rest will be scoured by river flow. Thus, the amount of excavation of the cut off work can be significantly reduced and the construction can be speed up.
出处 《水利学报》 EI CSCD 北大核心 1997年第9期60-65,共6页 Journal of Hydraulic Engineering
关键词 裁弯工程 基本成型法 河道整治 meandering river, cut off work, main channel, flood protection embankment, estuarine stretch, tide.
  • 相关文献

参考文献6

  • 1周文波,五甲渡裁弯工程新河自然冲刷研究,1995年
  • 2谢鉴衡,河床演变与整治,1990年
  • 3潘庆--,国际水力学研究协会泥沙输移模拟比尺影响学术讨论会论文集,1986年
  • 4潘庆--,人民长江,1978年,1期
  • 5胡冰,长江中下游护岸工程经验选编,1978年
  • 6熊绍隆,曹娥江五甲渡裁弯工程初步设计,1995年

同被引文献1

  • 1XIONG Shao-long, XU Zhao-cai, WANG Wen-jie. New method for mender-loop cutoffs [J]. Journal of Hydraulic Engineering, ASCE, 2002, 128 (2): 354-358.

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部