摘要
钢筋混凝土蜗壳结构比较复杂。通过总结左江电站的施工实践,介绍蜗壳设计与施工中应注意的问题。
Structure of R.C. Spiral case is more complicated. This paper, through summarizing construction practice of Zuojiang hydropower station, introduced some noteworthy problems of design and construction of that.
出处
《广西水利水电》
1997年第1期58-63,共6页
Guangxi Water Resources & Hydropower Engineering
关键词
钢筋混凝土
蜗壳
水电站
厂房施工
R.C. spiral case, foundation blot opening, draft tube liner, arc protective plate, bent pipe section, base ring, base plate