期刊文献+

新意法隧道设计施工概述 被引量:29

Design and Construction of Tunnels by means of ADECO-RS Approach
下载PDF
导出
摘要 20世纪70年代中期,意大利的Pietro Lunardi教授开始研究并逐步创立了岩土控制变形分析法(ADECO-RS法),该方法用中文解释为"新意法"。介绍新意法的理论基础、新意法隧道设计施工的基本步骤以及新意法与新奥法的不同之处,为新意法在我国的推广应用提供参考。 From the mid of 1970s, an Italian professor named Pietro Lunardi started to study on the design and construction of tunnels using the approach based on the analysis of controlled deformation in rocks and soils (ADECO-RS approach in short) and gradually established a system of design and construction of tunnels by means of ADECO-RS approach, which in Chinese is called New Italian Tunneling Method (NITM in short). The theoretical basis of ADECO-RS approach, the procedures of the design and construction of tunnels by means of ADECO-RS approach and the differences between ADECO-RS approach and NATM are presented, which can provide reference for the application of ADECO-RS approach in China.
出处 《隧道建设》 2008年第1期46-50,55,共6页 Tunnel Construction
关键词 岩土控制变形分析法(ADECO-RS法) 超前核心土 挤出变形 预收敛 收敛 约束作用 超前约束作用 approach based on analysis of controlled deformation in rocks and soils ( ADECO-RS approach ) advancecore extrusion preconvergence convergence confinement preconfinement
  • 相关文献

参考文献6

  • 1高新强,仇文革,关宝树.新建铁路隧道动态设计系统的构思[J].铁道标准设计,2004,24(8):44-47. 被引量:9
  • 2[2]Pietro Lunardi.The design and construction of tunnels using the approaeh based on the analysis of controlled deformation in rocks and soils[J].Tunnels & Tuunding International ADECO-RS Approach,2000(5):3-30.
  • 3[3]P.Lunardi,R.Bindi.The evolution of reinforcement of the advance core using fibre glass elements for short and long term stability of tunnels under difficult sliess-straiu conditions:design,technologies and operating methods[C]//Progress in Tunnelling after 2000:Proceedings of the AITES-ITA 2001 World Tunnel Congress Milan-Italy 10th-13th June 2001.Volume Ⅱ.Bologna:PATRON EDITORE,2001:309-322.
  • 4[4]P.Lunardi.The ADECO-RS Approach in the design and construction of the Rome to Naples high speed railway line:a comparison between final design specifications,conshruction design and"as-built"[C]//Progress in Tunnelling after 2000:Proceedings of the AITES-ITA 2001 World Tunnel Congress Milan-Italy 10th-13th June 2001.Vdume Ⅲ.Bologna:PATRON EDITORE,2001:329-340.
  • 5[5]P.Lunardi,C.Silva,A.Focracci.The Bologna to Florence high speed railway line:92km through the Appennines[C]//Progress in Tunnelling after 2000:Proceedings of the AITES-ITA 2001 World Tunnel Congress Milan-Italy 10th-13th June 2001.Volume Ⅲ.Bologna:PArIRON EDITORE,2001:341-351.
  • 6[6]P.Gattinoni,M.Papini,L.Seesi.Geologic risk in underground works[C]//Progress in Tunnelling after 2000:Proceedings of the AITES-ITA 2001 World Tunnel Congress Milan-Italy 10th-13th 2001.Volume Ⅰ.Bologna:PATRON EDITORE,2001:309-318.

二级参考文献3

  • 1关宝树译.情报化施工通信系统的开发[R].成都:西南交通大学,2000..
  • 2西南交通大学.南昆铁路隧道专题研究报告--隧道工程计算机信息化设计、施工管理系统[R].成都:西南交通大学,1990..
  • 3关宝树.隧道力学概论[M].成都:西南交通大学出版社,1998.121.

共引文献8

同被引文献217

引证文献29

二级引证文献215

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部