地铁盾构隧道桩基托换施工技术研究 被引量:49

Pile Foundation Underpinning Technology Applied in Construction of Shield-bored tunnels
下载PDF
导出
摘要 城市地铁盾构隧道在从地面建筑物下穿越时,会对既有建筑物的安全稳定造成影响。如何合理控制由于隧道施工引起地面建筑物的倾斜、地基沉降,是地铁工程设计和施工时必须考虑的。以广州地铁五号线盾构区间建筑物桩基托换为例,详细讲述桩基托换设计、施工全过程,给类似工程的设计、施工提供参考。 The safety and stability of the existing buildings may be jeopardized when shield-bored tunnels stretch underground. During the design and construction of Metro works, efforts must be made so as to control the leaning of the buildings and the settlement of the gruund caused by tunnel construction within the allowable values. Taking the pile foundation underpinning made during the construction of the shield-bored tunnel on line 5 of Guangzhou Metro as example, the authors present in detail the design and construction procedure of the underpinning, which can provide reference for the design and construction of similar works in the future.
出处 《隧道建设》 2008年第2期209-212,共4页 Tunnel Construction
关键词 地铁 盾构隧道 桩基托换 地表沉降 Metro shield-bored tunnel pile foundation underpinning surface subsidence
  • 相关文献

参考文献1

  • 1[5]广州市轨道交通五号线(动物园至杨箕)区间详细勘察阶段岩土工程勘察报告[R].广州:广东省建筑设计研究院,2004.

同被引文献262

引证文献49

二级引证文献362

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部