摘要 目前我国大部分铁矿山面临由露天转入地下开采问题,而由露天转入地下开采会遇到许多新的技术问题,其中最主要的问题是如何实现平稳过渡和如何实现生产衔接。针对露天转地下开采的主要问题即平稳过渡措施问题,制定出了一系列平稳过渡的措施方案:分期建设、增加脉内措施井(巷)工程、回收残矿等,取得了理想的效果。 Presently, most of the iron mines in China have to face the issue of transition from open-pit mining to underground mining. Such transition will involve many technical issues and the most important one is how to realize a steady transition and the production convergence. In light of the main issue in the transition from open-pit mining to underground mining, a series of measures for a steady transition were planned, adopted and achieved ideal effect, including staged construction, increase of in-vein measure shaft(drift) engineering and recovery of residual ore.
出处 《金属矿山》 CAS 北大核心 2008年第7期27-29,159,共4页 Metal Mine
关键词 露天转地下 平稳过渡 措施方案 技术研究 Transition from open-pit to underground mining steady transition measures and plan technical research
  • 相关文献

参考文献10

二级参考文献17

共引文献66

同被引文献231

引证文献20

二级引证文献122

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部