介绍了潘家口水电厂运行初期1#机尾水管严重的漏水现象,并对有关过程的原因进行分析。采取钢板补焊、充填灌浆等处理对策与措施,解决1#机尾水管严重的漏水问题。
There occurred severe leakage in the clraft tube No.1,panjiakou hyolropower planr cluring initial operation.The analysis of rupture process,the renovaltion measures and effectiveness are introduced.
出处
《华北水利水电学院学报》
1997年第4期39-42,共4页
North China Institute of Water Conservancy and Hydroelectric Power