天生桥一级水电站自 1994年 12月截流以来 ,在各方的努力和支持下 ,工程建设一步上一个新台阶。目前 ,主体工程、移民工程和机电设备采购正同步进行 ,面板堆石坝已填筑近 90 0万 m3,引水发电系统、机电安装正全面进行 ,放空隧洞已基本完工 ,工程进展顺利 ,第一台机组可望在
Since the river was successfully diverted in December,1994 Under the efforts of various parties involved,the construction of TSQ 1 project is stepping on a new stage.At present,main project′s construction,resettlement works and purchasing of hydraulic machinery and electrical equipment are in progress by steps The embankment volume of the dam reaches 9×10\+6m\+3,The diversion and installation works are fully developing The intermediate outlet construction has been completed The project is now going well,and hopefully to realize the goal of commissioning in 1998