摘要
阐述天生桥一级水电站厂房超大吨位钢吊车梁的设计思想、计算方法、焊缝设计和钢材选用的一般原则 。
This paper presents a design idea,caculation method,welding seam design and the general principle for material selection of steel crane girder for the powerhouse of TSQ- 1 hydropower project.The paper also discusses the caculation method based on the structural characteristic of the steel crane girder.
出处
《红水河》
1997年第4期54-57,共4页
Hongshui River
关键词
钢吊车梁
水电站
厂房
吊车梁
steel crane girder, 3- dimension finite element method,TSQ- 1 hydropower project