摘要 针对清江梯级水库群中长期调度问题,根据最优调度结果确定了调度图的型式,引入了可能出力的概念,对水库群进行聚合,建立梯级总出力与梯级可能出力之间的关系.然后根据总出力是否为保证出力进行决策分解,由此采用一连串的二维水库调度图来描述水库群的联合调度规则.基于模拟调度,建立了优化模型,采用多目标遗传算法NSGA-Ⅱ进行优化计算,得到较好的联合优化调度图.模拟计算表明:对于1951-2005年实测径流系列,若采用梯级水库群联合优化调度图较常规调度方案年均发电量增幅可达2.62%;对于两种随机模拟方法生成的水文径流系列,若采用梯级水库群联合优化调度图,年均发电量可分别提高1.77%和2.52%,理论上经济效益显著. Deriving the optimal operating curve rules for Qingjiang cascade reservoirs based on aggregated reservoir method was studied.The determined dynamic programming method was used to solve the optimization model.By analysis of the optimal operating tracks,the pattern of curve rules was obtained based on aggregated reservoir method.As the simulation-based model was built, a multi-objective genetic algorithm,NSGA-Ⅱ,was used to solve it and yielded a set of Pareto solutions.The Qingjiang cascade hydropower plants were selected as the case study,and there is an increase of 2.62 % in the hydropower generation by inputting the series during 1951 to 2005 period.As compared with the conventional rulse,the proposed method can increase hydropower generation by 1.77 % and 2.52 % respectively by using two types of synthetic hydrological data.
出处 《华中科技大学学报(自然科学版)》 EI CAS CSCD 北大核心 2008年第7期63-66,共4页 Journal of Huazhong University of Science and Technology(Natural Science Edition)
基金 国家自然科学基金资助项目(50609017) 湖北省自然科学基金资助项目(2005ABA315)
关键词 梯级水库群 优化调度 联合调度图 聚合水库 cascade reservoirs optimal operation operating curve rules aggregated reservoir
  • 相关文献

参考文献5

二级参考文献25

  • 1吴正义,汤洁,邹建国,施冲.乌江流域梯级水电站的经济运行研究[J].水电厂自动化,2005,26(1):109-113. 被引量:15
  • 2刘攀,郭生练,庞博,王才君,张洪刚.三峡水库运行初期蓄水调度函数的神经网络模型研究及改进[J].水力发电学报,2006,25(2):83-89. 被引量:22
  • 3Wu Y G. Ho C Y, Wang D Y. Adiploid genetic approach to short-term scheduling of hydro-thetmal system[J]. IEEE Trans on Power Systems, 2000,15(4): 1 268-1 274.
  • 4Yeh W W G. Reservoir management and operation models: a state of the art review[J]. Water Resources Research, 1985, 21(12): 1 797-1 818.
  • 5Oliveira R,Locks D P.Operating rules for multireservoir systems[J].Water Resour Res,1997,33(4):839-852.
  • 6Chang Fi-john,Chen Li,Chang Li-chiu.Optimizing the reservoir operating rule curves by genetic algorithms[J].Hydrol Process,2005,19:2277-2289.
  • 7谭维炎,刘建民,黄守信(Tan Wei-yan,Liu Jian-min,Huang Shou-xin).四川水电站群水库优化调度图及其计算(Reservoir Optimal Operation Chart and Its Calculation of Hydropower Group in Sichuan Province).张勇传(Zhang Yong-chuan)主编.优化理论在水库调度中的应用(Optimal Theory and Its Application in Reservoir Operation)[M].长沙:湖南科学技术出版社(Changsha:Hunan Science and Technology Press),1985.
  • 8Chang Jian-xia,Huang Qiang,Wang Yi-min.Genetic algorithms for optimal reservoir dispatching[J].Water Resour Manage,2005:19,321-331.
  • 9Chang Fi-john,Lai Jihn-sung,Kao Li-shan.Optimization of operation rule curves and flushing schedule in a reservoir[J].Hydrol Process,2003,17(8):1623-1640.
  • 10Young G K. Finding reservoir operating rules[J]. Journal of Hydraulics Division, 1967, 93(6) : 297-321.

共引文献91

同被引文献253

引证文献22

二级引证文献328

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部