摘要 为了提高我国200m级高土石坝的设计和施工水平,电力工业部“八五”国家科技攻关课题针对高堆石坝关键技术、混凝土防渗墙材料及接头型式、防渗墙施工、高土石坝抗震、勘测关键技术和高土石坝施工水力学问题等进行了研究,取得了一些重大研究成果。这些成果对减少工程投资,加快施工进度,保证工程安全有重要意义。 In order to enhance the level of design and construction for high embankment with the height of over 200 m in China,the Ministry of Power Industry has organized some experts to study the following technologies in the Eighty Five Year Plan:key technologies of high embankment dam,concrete impervious materials and their connection types,the construction of diaphragm,earthquake resistance for high embankment dam,key survey technologies and the construction hydraulics have been gained of high embankment dam,etc.,And some important research results have been gained.These results have significance on reducing the project investment,quickening the construction progress and ensuring the safety of the project.
出处 《水力发电》 EI 北大核心 1997年第10期33-36,44,共5页 Water Power
基金 国家"八五"科技攻关专题
关键词 高土石坝 土石坝 水工建筑物 high embankment dam,diaphragm,earthquake resistance,survey technology,construction hydraulics
  • 相关文献

同被引文献13

引证文献3

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部