摘要
文章根据赵楼煤矿的地质报告和矿井基建时期的热环境观测等资料,运用热力学第一定律对赵楼煤矿首采工作面的热环境进行预测,并在此基础上提出了热害治理的措施,即采用以机械降温为主其他降温措施为辅的综合治理措施,为首采工作面的顺利开采提供重要科学依据。
Base on geological report of Zhaolou mine and mine capital construction datum such as heat circumstance observation, this paper forecasts the heat circumstance of Zhaolou mine primary face by energetics thermodynamics, then brings forward the measure of heat injury, which is a integrate measure using mechanical cooling as the principal and else as supplements, providing an important science gist for the exploitation of primary face.
出处
《科技成果管理与研究》
2008年第7期13-15,共3页
Management And Research On Scientific & Technological Achievements
关键词
热害
地热
机械降温
heat injury
geothermal
mechanical coohng