摘要
阐述了水利枢纽船闸引航道口门区各种不利流态产生的原因,及其危害性,和提出了改善的措施。
This paper presents the producing cause of different unfavourable flow conditions in the outlet area of approach channel for ship gate and its perniciousness. The improvement measures are put forward to and some project examples showed the effect of these measures.
出处
《人民珠江》
1997年第5期29-31,共3页
Pearl River
关键词
水利枢纽
船闸
引航道口门区
流态改善
Water project, ship gate, outlet area of approach channel, flow condition improvement countermeasures