摘要
为有效管理和控制EAST实验装置上数十套数据采集子系统,需要在总控系统与数据采集子系统之间构建一套数据采集控制系统,提供信息服务、流程控制和状态监视等功能。该系统采用C/S模式和B/S模式相结合的体系结构进行设计,已在2006年度EAST实验中得到成功应用。
For managing and controlling dozens of data acquisition subsystems on EAST, it is necessary to make data acquisition control system between master control system and the data acquisition subsystems. Data acquisition control system provides information services, process control and status monitor, etc., and its design is based on C/S and B/S combination mode. An application of this system has been demonstrated on EAST Tokamak in 2006.
出处
《计算机工程》
CAS
CSCD
北大核心
2008年第14期228-230,共3页
Computer Engineering
基金
EAST国家大科学工程基金资助项目(计投资(1998)1303)