7Marengo H.Case study:dam safety during construc-tion,lessons of the overtopping diversion works atAguamilpa Dam[J].Journal of Hydraulic Engineering,ASCE,2006,(11):1121-1128.
8Abraham W,Rafael S.Practical multifactor approachto evaluating risk of investment in engineering projects[J].Journal of Construction Engineering and Manage-ment,2004,130(3):357-367.