摘要
SANZANKURUK油田自2004年以来,通过开展剩余油研究、PDK测井资料应用、完善堵水工艺等措施,连续三年稳产20×104t,综合含水从2004年的85.2%到目前86.8%,开发效果良好,本文就大倾角构造岩性油藏堵水工艺进行总结与有效性探讨。
From the year of 2004, the oil production in Sanzankuruk oil field overrun 200 thousands tons over 3 years and the composite water cut move upward from 85. 2% to 86. 8% present. It mainly attribute the success to the work of remaining oil study, the data of PDK logging applying and improve water shutoff technics. We will summarize the water shutoff technics and its effectiveness in high dig angle structure-lithologic deposit.
出处
《内蒙古石油化工》
CAS
2008年第10期52-53,共2页
Inner Mongolia Petrochemical Industry
关键词
构造油藏
稠油
PDK找水
堵水
Structural oil pool
Heavy oil
PDK logging water detection
Sater shutoff