期刊文献+

盐锅峡水电站增容改造中水轮发电机组负荷抽动原因分析

Reason Analysis of Hydraulic Turbine Generating Units Load Twitch During Increasing Capacity of Yanguoxia Hydropower Plant
下载PDF
导出
摘要 盐锅峡水电站于2001-2004年对4台机组进行增容改造工作。在保持机组蜗壳、尾水管、引水管等几何尺寸不变以及保持接力器、导水机构、调速器等部件不变的情况下,通过将原HL240-LH-410碳钢转轮改造为优化设计后的HLD303C-LH-424.7新型不锈钢转轮,使单机容量由44MW增至50MW,但增容后2台5^#、9^#机组相继出现在额定操作油压下负荷摆动或导水叶拒动现象,文章就此问题进行了分析。 The capacity increasing of Yanguoxia hydropower plant's 4 sets of unit has been accomplished from 2001 to 2004, under the situation of keeping the geometrical size of spiral cases, draft tubes and diversion pipes as well as the component of servomoter, distributor and speed governor, and through reforming the original HI2240 - LH - 410 carbon steel runner into the optimized HLD303C - LH - 424.7 stainless steel runner, thus made the capacity increase from 44 MW to 50 MW, however two sets of 5^# ,9^# units has been successively occurred load twitch under rated operating oil pressure or blade failure phenomenon, the paper makes an analysis on above - mentioned problean.
作者 何晋军 邓义
出处 《青海电力》 2008年第2期33-35,57,共4页 Qinghai Electric Power
关键词 水轮发电机组 增容改造 负荷 抽动 原因分析 Hydraulic turbine generating units increasing capacity load twitch reason analysis
  • 相关文献

参考文献3

  • 1刘国柱.水轮机[M].水利电力出版社,1986
  • 2刘晓婷,李维藩.水力机组现场测试手册[Z].水利电力出版社,1993
  • 3盐锅峡水电厂历年机组检修资料[Z]

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部