摘要
左岸坝肩为坚硬的熔结火山角砾岩,但距坝体50m处发育一条Ⅲ级结构面(F5断层),坡脚出露软弱的强风化云煌岩,故造成此带岩体卸荷强烈,且发育一组顺河向的节理,延伸长、张开、无充填,是绕坝渗漏的主要通道。施工中未做好帷幕灌浆,水库试蓄水后,渗漏严重,经二次帷幕灌浆工程处理后,已无渗漏,边坡稳定性好。
Rock formation at left abutment is volcanic breccia, but a structural plane (fault F5) of grade Ⅲ is developed 50m away from dam and heavy weathering is outcropped at hill foot, causing strongly load relieved rockmass and a long, open joint group. As curtain grouting is not well done in construction, after impounding, percolation is found serious. After secondary grouting, no seepage is found and side slope is stable.
关键词
坝基
卸荷裂隙
渗漏分析
帷暮灌浆
工程处理
金河四级水电站
dam formation
load relieved fissure
seepage analysis
curtain grouting
engineering treatment
Jinhe-4 hydropower project