期刊文献+

水电站调压室设置必要性判式的分析研究 被引量:2

Analysis on the necessary formula of setting up surge tank for hydropower station
下载PDF
导出
摘要 【目的】探寻一个更为直接、细化的考虑多因素的水电站调压室设置的必要性判式。【方法】在分析和理解传统的水电站调压室设置判式的基础上,阐述了其在实际应用过程中需反复调整参数及未直接考虑材料强度的不足,依据设备允许的承压要求提出新判式,并对新判式的实用性进行了验证。【结果】利用新判式计算结果更为符合工程实际,达到了预期的研究目的。【结论】新判式可提供一个较为客观准确的"数量值",作为调压室设置与否的判据。 [Objective] The studry probed into a more direct and detailed formula of setting up surge tank of hydropower station. [Method] On the basis of analysing traditional formula,which didn't take account of repeatedly adjusting parameters and the strength of material,a new formula was put forward according to the equipments' pressure-tolerance. [Result] The new formula agrees with reality ,achieving the aim of the study. [Conclusion] The new formula can provide an objective and correct value,and can be regarded as the discriminant for setting up surge tank.
出处 《西北农林科技大学学报(自然科学版)》 CSCD 北大核心 2008年第8期218-222,共5页 Journal of Northwest A&F University(Natural Science Edition)
基金 国家冻土工程重点实验室项目(9901)
关键词 水电站 调压室设置 必要性判式 hydropower station setting up surge tank necessity formula
  • 相关文献

参考文献14

二级参考文献20

共引文献30

同被引文献3

  • 1吴应文.用水压补偿装置改善水轮机调节系统调节品质的研究与试验[J].水电能源科学,1987,5(3):259-270.
  • 2鲍海艳.水电站调压室的设置条件及运行控制研究[M].武汉大学,2010.
  • 3赵正飞,张晓宏,张彦航.上游调压室设置公式的对比分析[J].水资源与水工程学报,2009,20(3):94-96. 被引量:4

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部