摘要
针对500 kV汊桥5296线大胜关长江大跨越连续2次发生跳闸的故障,从设备运检状况、绝缘配置及盐密测量、气象及污秽情况等多方面进行了深入分析,并制定出相关处理对策。
In allusion to continuous two breaker trips happened in 500 kV Chaqiao 5296 line at Dashengguan Yangtse River crossover,many conditions which include equipment running and checking, insulator configuration, salt density measuring, meteorology and dirty and so on are analyzed deeply. And processor countermeasures are ruled.
出处
《江苏电机工程》
2008年第4期22-24,共3页
Jiangsu Electrical Engineering
关键词
大跨越
跳闹
故障分析
处理对策
big crossover
tripping
failure analysis
processing countermeasure