期刊文献+

考虑属性区域值的板坯设计模型与算法 被引量:2

Model and Algorithm for Slab Design With Interval Value Attributes
下载PDF
导出
摘要 针对钢铁企业板材生产中的板坯设计问题,建立了考虑属性区域值的板坯设计模型。区域值板坯设计的宽度和重量属性均为区间数值。根据建立的模型,提出了基于合同-板坯矩阵进行计算的启发式算法,并通过计算实例和数学实验对提出的算法进行了说明和验证。 An interval value model is established to solve the slab design problem in steel plants. The interval value means that the demands of customers about width and weight are variable value in some definite scope instead of fixed number. A heuristic algorithm is developed based on the orderslab matrix to solve the model. An example and the computing numerical experiments are given to validate the proposed algorithm.
出处 《铸造技术》 CAS 北大核心 2008年第7期945-948,共4页 Foundry Technology
关键词 区间值 板坯设计 启发式算法 生产管理 Interval value Slab design Heuristic algorithm Production management
  • 相关文献

参考文献6

  • 1Milind D, Jayant K, Ho S L,et al. The Slab-Design Problem in th steel industry[J].Interface, 2004,34 (3):215-225.
  • 2Kangbok Lee, Soo Y Chang, Yushin Hong. Continuous slab casterscheduling and interval graphs[J]. Production Planning & Control, 2004,15 ( 5 ) : 495- 501.
  • 3Chang S Y, Myong-Rae Chang, Yushin Hong. A lot grouping algorithm for a continuous slab caster in an integrated steel mill[J]. Production Planning & Control, 2000,11 (4) : 363-368.
  • 4K Harste, K -H Tacke. Slab caster design criteria for high quality steel[J]. Steelmaking Conference Proceedings, 1997:679-686.
  • 5刘光航,李铁克.炼钢-连铸生产调度模型及启发式算法[J].系统工程,2002,20(6):44-48. 被引量:29
  • 6田乃媛,唐洪华,宋立东.薄板坯连铸连轧技术的最新进展[J].钢铁,2001,36(5):69-72. 被引量:18

二级参考文献5

共引文献45

同被引文献18

  • 1周世春,丁建华,陈超.“大规模定制”生产模式在钢铁企业的应用实践[J].中国工程科学,2006,8(3):1-6. 被引量:7
  • 2刘相华,王国栋,杜林秀,刘振宇.钢材性能柔性化与柔性轧制技术[J].钢铁,2006,41(11):32-36. 被引量:23
  • 3Balakrishnan A, Geunes J. Production planning with flexible product specifications: an application to specialty steel manufacturing. Oper Res, 2003, 51(1) : 94
  • 4Frisch A M, Miguel I, Walsh T. Modelling a steel mill slab design problem//Proceedings of the IJCAI-01 Workshop on Modelling and Solving Problems with Constraints. Christian Bessiere, 2001;39
  • 5Frisch A M, Miguel I, Walsh T. Symmetry and Implied Constraints in the Steel Mill Slab Design Problem//Proceedings of the CP-01 Workshop on Modelling and Problem Formulation. Christian Bessiere, 2001 : 8
  • 6Brahim H, Zeynep K, Ian M, et al. Hybrid modelling for robust solving. Ann Oper Res, 2004, 130(1/4): 19
  • 7Denton B, Gupta D, Jawahir K. Managing increasing product variety at integrated steel mills. Interfaces, 2003, 33(2) : 41
  • 8Milind D, Jayant K, Ho S L, et al. The slab-design problem in the steel industry. Interfaces, 2004, 34(3) : 215
  • 9Kangbok L, Soo Y C, Hong Y S. Continuous slab caster scheduling and interval graphs. Prod Plann Control, 2004, 15(5) : 495
  • 10A Balakrishnan,J Geunes. Production Planning with Flexible Product Specifications: An Application to Specialty Steel Manufacturing [J]. Operations Research, 2003, 51 ( 1 ) : 94-112.

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部