摘要
本文推导了一般露天矿山铲—车优化配置的数学模型表达式,并以峨眉水泥厂矿山为例进行了优化配置计算。优化结果表明本文方法是有效的。
A general mathematical model of excavator truck Optimal fit in Open pit mines is derived. An Optimal fit computation is taken as an example of the mine of Emei Cement Plant.The Optimal result shows that the Optimal model is effective.
出处
《西南工学院学报》
1997年第3期69-72,共4页
Journal of Southwest China Institute of Technology