摘要
锅炉吊装机械的选择和布置是锅炉安装策划的一项重要工作,决定了吊装工作的难度、可操作性和工程进度。为此,对国电黄金埠电厂一期2×600MW超临界机组锅炉进行了吊装机械的选择和布置,并对不同方案进行比较,经过不同机械的组合,最终达到经济合理的目标。
Selecting and arranging hoisting machinery is one of the key tasks in boiler installation planning, which determines the difficulty and operability of hoisting, and construction schedule. Therefore, machinery used in the 2 ×600 MW SC unit boiler hoisting is selected and arranged. Different schemes are also compared. Through different combinations, economical objective is finally achieved.
出处
《电力建设》
2008年第8期95-97,共3页
Electric Power Construction
关键词
超临界机组锅炉
吊装机械
起重性能
选择
布置
SC unit boiler
, hoisting machinery
lifting capability
selection
arrangement