1Mills, G. Welfare and profit divergence for a tolled link in a road network[J]. Journal of Transport Economics and Policy. 1995,29 : 137 - 146.
2Verhoef, E. The Economics of Regulating Road Transport[M]. Edwars elgar,Brokfield, 1996.
3Yang H, Meng Q. Highway pricing and capacity choice in a road network under a build-operate-transfer scheme [J ].Transportation Research, 34A, 2000,207 - 222.
4Louie Nan Liu, John F. McDonald. Economic efficiency of second-best congestion pricing schemes in urban highway systems[J]. 33B, 1999,157- 188.
5L.Y.shen,H.Li,Q.M.Li.Alternative concession model for build operate transfer contract projects[J].Journal of construction Engineering and management,2002,128(4):326~330.
6Beijing Engineering Consultant Corporation(BECC).Guideline on the application of BOT project[M].Beijing:Earthquake publication,1995.15~64.
7刘伟华译.Risk management[M].北京:中信出版社,2002.100-129.
8Mills, G. Welfare and profit divergence for a tolled link in a road network[J]. Journal of Transport Economics and Policy. 29,1995,137~146.
9Verhoef, E. The Economics of Regulating Road Transport. Edwars elgar, Brokfield, 1996.
10Yang H, Meng Q. Highway pricing and capacity choice in a road network under a build-operate-transfer scheme[J]. Transportation Research, 34A, 2000,207~222.