基于委托—代理理论的BOT项目特许期研究 被引量:12

The Research on the Concession Period of BOT Project Based on the Agent-principle Theory
下载PDF
导出
摘要 BOT项目融资作为私人投资公共基础设施的重要形式越来越受到各国政府的重视,但目前许多BOT项目都出现了政府过度担保和项目再谈判的现象,使社会效益受到损失。其原因主要是项目激励作用没有得到充分发挥,特别是BOT项目特许期作为激励手段没有体现出来。利用委托——代理理论研究了BOT项目中政府与项目公司之间的委托——代理关系。通过确定政府与项目公司的分成比例,建立了BOT项目的特许期决定模型;通过研究激励相容机制,确定了项目公司最优产量决定模型。结果表明,BOT项目特许期与项目的收益呈正相关关系,与项目成本呈负相关关系,同时与项目本身的风险大小程度和项目公司对待风险的态度有关。项目公司的最优化产量受产品定价和项目成本系数限制,产品定价越高、项目的成本系数越小,项目公司越倾向于增加产量。 As an important method for private investment in communal facilities, BOT project financing has gained more and more attention in the eyes of governments in many countries. However, at present many BOT projects involve excessive government guarantee and project renegotiation, which have a damage on social profits, and the main reason is that the incentive role of BOT projects has not been fully played, especially the role of the concession period of the BOT project as an incentive method has not been embodied. In this paper the author using Agent-Principle theory study the Agent-Principle relationship between the government and project company of BOT project. By determining the profit share ratio between the government and the project company the author set up the concession period deciding model of the BOT project. By studying the mechanism of incentive compatibility constraint the author set up the output of production optimizing model of BOT project. The conclusion showed that the concession period has the direct proportion with the profit and has the inverse proportion with the cost of the project, and is effected by the risk of the project and the attitude of the project company. The optimizing output of production is decided by the price of concessionary products and the coefficient of variable cost. The higher the price, the lower the coefficient of the project cost and the more of the production output.
出处 《科学学与科学技术管理》 CSSCI 北大核心 2008年第8期140-144,155,共6页 Science of Science and Management of S.& T.
基金 国家自然科学基金项目(70572097) 教育部博士点基金课题(20030141019) 辽宁省教育厅项目(20075447)
关键词 委托-代理 BOT项目 特许期 agent-principle theory BOT project concession period
  • 相关文献

参考文献14

  • 1Wilson, R. The structure of incentives for decentralization under uncertainty [J]. La Decision,1969(171).
  • 2Spence,M.and R,Zeckhauser. Insurance,information and individual action[J]. American Economic Review,1971(61): 380- 387.
  • 3Ross,S. The economic theory of agency: The principal's problem [J]. American Economic Review, 1973(63):134-139.
  • 4Mirrless,J. The optimal structure of authority and incentives within an organization [J]. Bell Journal of Economies, 1976 (7): 105-131.
  • 5Holmstrom,B. Moral hazard and obser-vability[J].Bell Journal of Economics, 1979,10 (1): 74-91.
  • 6Grossman,S.and Hart,O. An analysis of the principal-agent problem[J].Econome-trica,1983(51):7-45.
  • 7Sapp, Ington, D. Incentives in principal-agent relationships [J].Journal of Economic Perspectives,1991(5):45-66.
  • 8Alchian,A.and Demsetz, H. Production,information costs and economic organization[J], American Economic Review, 1972 (62):777-795.
  • 9Eugenia,F.T. State university bo-ards of trustees: A principal-agent persp-ective [J]. Public Choice,1986(49):155-1.
  • 10曹玉贵.工程监理制度下的委托代理分析[J].系统工程,2005,23(1):33-36. 被引量:36

二级参考文献12

共引文献168

同被引文献111

引证文献12

二级引证文献34

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部