摘要
根据装配式部分预应力混凝土连续箱梁预制的施工实践,对装配式部分预应力混凝土连续箱梁预应力钢束张拉的技术做了较全面系统地介绍,并阐述了施工控制的标准,提出了一些提高施工质量的措施,以供类似工程参考借鉴。
Based on the construction practice of assembly partial prestress concrete continuous box beam prefabrication, the technology of assembly partial prestress concrete continuous box beam prestress steel bundle stretching was introduced more comprehensive and systemic, the standard of construction control was explained, and measurement of improving construction quality was provided, so as to provide references for similar engineering,
出处
《山西建筑》
2008年第24期298-298,368,共2页
Shanxi Architecture
关键词
箱梁
张拉施工
钢绞线
预应力
box beam, stretching construction, steel strand, prestress